Live / Hetzner / Incident
Hetzner: API failure for metrics
Hetzner · hetzner.comResolved2026-11-13 18:57 UTC
Public — what happened
Summary
Hetzner said that starting at 15:01 UTC on 2026-11-13, the interfaces used to retrieve performance metrics for servers and load balancers were failing, or returning incomplete data. The company said it found the problem shortly after it began and started working on a repair. At 18:57 UTC it reported that the error had been fixed and that it was watching the systems closely, so the incident is still marked as monitoring and not yet resolved.
Timeline
- Started — 2026-11-13 15:01 UTC
- Monitoring — 2026-11-13 18:57 UTC
- Resolved — 2026-11-13 18:57 UTC · 3h 56m after it started
What SquidGrid measured
SquidGrid measured 233 internet paths into Hetzner’s network during this incident. None of them ran meaningfully slower than the same paths the day before.
With SquidGrid — where it starts on the route
Independent path health
The status page is the symptom. SquidGrid measures the paths that reach Hetzner against their own baselines — whether the routes carrying your traffic degraded, at which handoff, and who owns that stretch.
🔒 Sign in to seeCustomers get the live Provider Assessment Report for Hetzner: paths off baseline right now, where on the route conditions change, and its full incident track record.
Included with any paid plan.
Open the Hetzner report →
More from Hetzner
Covered in The Squid’s Ink, Week 47, 2026, our weekly internet health report.